CLIENT:
TAV (Tepe Akfen Vie), BOT Company
AREA:
80.000 sqm. Terminal Extension
ABOUT PROJECT:
Concept Design
Design Development
Construction Drawings
DESCRIPTION:
The 2nd Phase of the new International Terminal of Atatürk Airport designed by GMWM was completed in 2002. The design was inspired by the belief that an airport terminal should, above all else, embody the qualities of simplicity and clarity of expression of its functions, and provide bright, transparent and comfortable spaces. The modular linear form provides a flexible and adaptable framework capable of responding to future changes and expansion. The Initial design capacity of 14 Million passengers per year was increased to 20 Million in 2004 and to 30 Million by 2012.